How much paint do I need?

Number of pitches or repeats you’re marking.

Coverage: – metres per litre

Total metres to mark: – m

Litres needed: – L

Recommended packs (10 L): –

Figures use average pitch lengths (Football 850 m, Rugby 1150 m) and your selected paint’s published coverage (metres per litre). Always check on-site conditions.