How much paint do I need?

Number of pitches or repeats you’re marking.

Coverage: metres per litre

Total metres to mark: m

Litres needed: L

Recommended packs (10 L):

Figures use average pitch lengths (Football 850 m, Rugby 1150 m) and your selected paint’s published coverage (metres per litre). Always check on-site conditions.